Post by clydesdale on Jul 23, 2013 21:36:24 GMT -5
This will be a dynamic thread of work that needs to be done on the trails in the CSRA. We want to keep it to just this thread to allow the USFS certified sawyers and other work groups to be aware of the trail conditions that need to be addressed. If you are aware of a particular trail condition (a tree down, bridge broken, etc) you can reply to this post with information about the trail, the condition and when you saw it and it will be added to this list and then your post will be deleted to keep this section very clean. Thank you!
Horn Creek - 1 tree 3/4 mile in ( Drawdy will remove); bridge near end of section 2 to be repaired (Paul leading Scout crew); sections 1 & 3 need some heger work (need 2 volunteers - your schedule - let me know if you can take care of this) 8/11/13
Bartram West (Petersburg to Wildwood) - Trees clear
Bartram East - Loop needs mowing 10/17/13
FATS - 8/11/13
Skinny - crossings cleared except 3rd crossing, lopping, mowing and repair some washed out tread (holes)
Brown Wave - mowing, lopping and clear crossings
Deep Step - clear crossings and some tread work - Zeaser clearing crossings
Great Wall - clear crossings and some tread repair
BR & Tower - TBD
Keg Creek - clear, may need some spot mowing
MODOC - all clear as of 10/20/13
Turkey Creek - trees down - 3.9 mile mark, 5.2 mile mark and potentially beyond as of 6/23/13
Hickory Knob - Finish repair of race damage
Wine Creek - Update 11-13 - approximately 6 trees down that need chainsaws distributed along the length of the trail.
Horn Creek - 1 tree 3/4 mile in ( Drawdy will remove); bridge near end of section 2 to be repaired (Paul leading Scout crew); sections 1 & 3 need some heger work (need 2 volunteers - your schedule - let me know if you can take care of this) 8/11/13
Bartram West (Petersburg to Wildwood) - Trees clear
Bartram East - Loop needs mowing 10/17/13
FATS - 8/11/13
Skinny - crossings cleared except 3rd crossing, lopping, mowing and repair some washed out tread (holes)
Brown Wave - mowing, lopping and clear crossings
Deep Step - clear crossings and some tread work - Zeaser clearing crossings
Great Wall - clear crossings and some tread repair
BR & Tower - TBD
Keg Creek - clear, may need some spot mowing
MODOC - all clear as of 10/20/13
Turkey Creek - trees down - 3.9 mile mark, 5.2 mile mark and potentially beyond as of 6/23/13
Hickory Knob - Finish repair of race damage
Wine Creek - Update 11-13 - approximately 6 trees down that need chainsaws distributed along the length of the trail.